How Do You Choose a Metallic Epoxy Installer

Nothing about a poorly prepared slab shows on pour day, because metallic epoxy hides its faults until the first hot summer or the first moisture event. The questions below (gathered from slabs in Riverside, CA and noted at metallic epoxy floors riverside john browns body) sort installers by how they answer on mechanical detail, not on price. A low quote tells nothing about the materials under it, and a painter's roller experience does not carry over to a self-leveling pour with metallic pigment.
Slab preparation and moisture

Ask how the slab will be prepared. Diamond grinding with a dust collector is the expected answer, not only an acid wash, which leaves a thin and uneven profile. Grinding opens the surface so the primer can bite. Then ask whether a moisture test will be done and by which method, a calcium chloride kit or in-slab humidity probes. Moisture vapor pushing up through concrete is a leading cause of coating failure, and an installer who skips the test is guessing about the base coat.
Topcoat and sun exposure

Ask which topcoat is planned. Plain epoxy ambers and chalks in direct sun, so a garage with a open door or a patio slab needs a UV resistant clear coat, usually polyaspartic or urethane. The answer should name a product and a thickness, not just the word "sealer." Hot tires in a Riverside driveway will also test whatever sits on top.
Samples and data sheets
Ask to see finished metallic floors in person, or in unedited photos. Lighting and filters change how metallic reads, and the movement in the pigment varies from one installer's hand to the next. Then ask for the product data sheets. Cure times, recoat windows, and temperature limits are printed there, and they can be checked against the schedule the installer is promising for the job.
Cracks, joints, heat and wind
Ask how cracks and control joints will be handled. Cracks should be routed and filled before the primer goes down, and the answer on joints should include whether they will be cut back after cure so the slab can still move without telegraphing through the finish. Ask also how work is planned around heat in the Inland Empire. Coating pushed through a 100 degree afternoon cures too fast, and santa ana winds blow dust and debris into wet material. A good installer shifts pours to early morning, shades the openings, or moves the day.
Warranty in writing
Get the warranty terms in writing and read the exclusions line by line. Moisture and hot tire pickup are often carved out, which removes the two most common failures. A long warranty does not prove the prep was done well. The record of the grinding, the moisture reading, and the product batch numbers says more than the number of years printed on the page.